Donfoam 812 HCFC-141B base blend polyols for block foam
INTRODUCTION
Donfoam 812 blend polyether polyols used for produce PUR block foam. The foam has uniform cell , low thermal conductivity, thermal insulation performance is good, flame retardant performance is good, low temperature no shrinking crack etc.
Widely used in the process of all kinds of insulation work such as: building external wall, cold storage, tanks, large pipes etc.
PHYSICAL PROPERTY
Appearance
Dynamic viscosity (25℃) mPa.S Density (20℃) g/ml Storage temperature ℃ Storage stability month |
Light yellow to brown transparent liquid 250±50 1.17±0.1 10-25 6 |
RECOMMENDED RATIO
Items |
PBW |
Blend Polyether Polyol
Isocyanate |
100 130 |
TECHNOLOGY AND REACTIVITY (the exact value varies depending on processing conditions)
Manual Mixing |
|
Raw Material Temperature ℃
Mould Temperature ℃ CT s GT s TFT s Free Density kg/m3 |
20-25 Ambient Temperature(15-45℃ ) 35-60 140-180 240-260 26-28 |
FOAM PERFORMANCES
Item |
Test Standard |
Specification |
Overall Molding Density
Molding Core Density |
GB 6343 |
40-45kg/m3 38-42kg/m |
Closed-cell Rate |
GB 10799 |
≥90% |
Initial Thermal Conductivity(15℃) |
GB 3399 |
≤24mW/(m.K) |
Compressive Strength |
GB/T8813 |
≥150kPa |
Dimensional Stability
24h -20℃ RH90 70℃ |
GB/T8811 |
≤1% ≤1.5% |
Water Absorption Rate |
GB 8810 |
≤3% |
Flammability |
ASTM E84 |
Class A |
Product detail pictures:
Related Product Guide:
We are commitment to offer you the aggressive price tag ,exceptional products and solutions high-quality, as well as fast delivery for Chinese Professional Pu System For Pipeline Insulation - Donfoam 812 HCFC-141B base blend polyols for block foam – INOV , The product will supply to all over the world, such as: Atlanta, Chile, UAE, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we will continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.
By Emily from Russia - 2017.09.26 12:12
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
By Helen from Finland - 2018.11.04 10:32